After initial fit of the wings and drilling the rear spar bolt hole, it was time to deal with wing root connectiions. Found the fuel lines too short so SS Flex lines from TS Flightlines were ordered. The tank attach point at the front of the wing had to be fabricated and slotted. Found wires in the molex connector for the right wing were reversed. Once correct, all strobes, nav lights, APRS and pitot heat worked correctly. Wing fairings were fabed and completed including rubber strips. Wings are ready for final install.